Lot line adjustment
Moving the boundary between adjoining parcels without creating a new building lot.
What it means
A lot line adjustment relocates the common boundary between two neighboring parcels. One owner conveys a piece of land to the other, and no additional lot is created. It requires a survey plan, a deed, and usually a planning board endorsement before recording.
Why it matters on the South Shore
Small adjustments solve everyday commercial problems: a parking row that sits partly on the neighbor’s land in Rockland, a loading area in Brockton that is five feet short for trucks, a building addition in Hanover that would break the side setback. Older parcels were often laid out before current zoning, so one fix can expose another shortfall. Check both lots against the dimensional table first.
In practice
A contractor wants a 2,400 square foot addition but would end up 8 feet from the side line where zoning requires 20. The neighbor sells a 15 by 200 foot strip, 3,000 square feet, for $30,000. Survey, plan, and legal work run about $7,000. Both lots still meet minimum area and frontage, and the neighbor’s lender signs a partial release.
Straight answers
- How do you move a lot line in Massachusetts?
- Typically a surveyor prepares a plan showing the old and new boundary, the planning board endorses it, often as an approval not required plan, and the plan and a deed conveying the strip are recorded at the registry of deeds. Local practice varies, so check with the town's planning office first.
- Does a lot line adjustment affect my mortgage or zoning compliance?
- It can affect both. Land being conveyed usually needs a partial release from any lender holding a mortgage on it. Both resulting lots also need to meet zoning for area, frontage, setbacks, and coverage, or you may create a violation. Confirm with your attorney and the building department.
Related terms
-
Approval not required plan (ANR)
A Massachusetts plan dividing land along an existing way that needs endorsement, not subdivision approval.
-
Boundary survey
A licensed surveyor's measured determination of a parcel's legal lines, corners, and encroachments.
-
Frontage
The length of a property's boundary along the street, and the visibility it provides.
-
Setback
The minimum distance a building must sit from a lot line, street, or other feature under the zoning bylaw.
← All 537 terms · Talk to a licensed advisor about your deal →