Glossary · Commercial real estate
Pre-leasing
Signing tenants for space before a building is built or renovated, often required to secure construction financing.
What it means
Pre-leasing is the process of securing signed leases from tenants for a building that is still in planning, under construction, or undergoing major renovation. Developers pre-lease to reduce lease-up risk, to satisfy construction lenders who condition funding on a minimum occupancy commitment, and to prove the project’s rents to equity partners. Pre-leases typically include delivery deadlines, outside termination dates if the project stalls, and detailed work letters because the space does not yet exist.
Why it matters on the South Shore
New commercial construction on the South Shore is limited and mostly build-to-suit or small: a 20,000 square foot flex building in Rockland, a medical office pad in Pembroke, a retail strip at a Route 3 interchange. Local lenders rarely fund speculative multi-tenant projects without a meaningful pre-lease. For ICS developer clients, pre-leasing is what turns a permitted site into a financeable project. For tenant clients, a pre-lease on a new building is a chance to lock in the right space at favorable terms, provided the lease protects them if delivery slips.
In practice
A developer plans a 15,000 square foot medical office building in Pembroke at $32 per square foot NNN with a $5.2 million total cost. The bank requires 50 percent pre-leasing. ICS brings a physical therapy group for 4,500 square feet and a dental practice for 3,200 square feet, 51 percent of the building, each with a $60 per square foot allowance and six months free rent. In exchange the leases carry an outside delivery date 18 months out with tenant termination rights and a $250 per day late-delivery credit after month 14.
Straight answers
- How much pre-leasing do lenders require for a construction loan?
- It varies with product type and lender appetite. For multi-tenant retail or office, construction lenders commonly want 40 to 60 percent of the space pre-leased to credit tenants before funding. Small industrial and flex sometimes gets built on speculation in strong markets. A single-tenant build-to-suit is effectively 100 percent pre-leased by definition.
- What does a tenant get for signing before the building exists?
- Leverage. The developer needs the signature to get the loan, so early tenants can negotiate lower rent, more free rent, a larger improvement allowance, or a better location in the project. The trade is risk: the delivery date can slip, the finished product may differ from the renderings, and the tenant is committed to a space it cannot see.
Related terms
-
Build-to-suit
A landlord builds or rebuilds a property to a tenant's specifications in exchange for a long lease.
-
Loan-to-cost (LTC)
The loan amount divided by the total cost of a project, including land, construction, and soft costs.
-
Stabilized value
What a property will be worth once leased to normal occupancy at market rents, used to size loans and plan exits.
-
Yield on cost
Stabilized NOI divided by total project cost: the return a development or renovation earns on what it spent.
← All 537 terms · Talk to a licensed advisor about your deal →