Glossary · Commercial real estate
Work letter
The lease exhibit that defines who builds what, to what standard, on what schedule, and who pays.
What it means
A work letter is an exhibit to a commercial lease that governs the construction of the premises before the tenant occupies them. It allocates the build-out between landlord’s work, which the landlord performs at its cost, and tenant’s work, which the tenant performs often with a landlord-funded tenant improvement allowance. It sets the design and approval process, construction standards, schedule, cost responsibility for changes and delays, and the mechanics for disbursing allowance funds. In a turnkey deal the work letter effectively is the construction contract between landlord and tenant.
Why it matters on the South Shore
Second-generation space dominates the South Shore market, so most leases involve converting someone else’s build-out: a former insurance office in Quincy into a dental suite, a Brockton retail bay into a physical therapy clinic, a Rockland warehouse into a contractor’s shop with office. Small landlords often offer a lump-sum allowance and a one-paragraph description of their work. That is where disputes over who pays for the electrical upgrade or the ADA restroom begin. ICS insists on a full work letter with plans attached for every tenant client, and reviews it alongside the tenant’s architect before the lease is signed.
In practice
A dental practice leases 3,000 square feet in Quincy at $30 per square foot with a $75 per square foot allowance, $225,000. The work letter specifies landlord’s work as demising, new HVAC sized for medical use, a 400-amp electrical service, and a code-compliant restroom, all at landlord cost outside the allowance. Tenant’s work covers everything else, funded by the allowance in three draws against invoices and lien waivers. The build-out comes in at $268,000; the tenant pays the $43,000 overage. Without the letter, the $38,000 electrical upgrade would have come out of the allowance and the overage would have been $81,000.
Straight answers
- What should a work letter include?
- A scope of landlord's work and tenant's work, the plans or a process for approving them, the construction standard and finish specifications, the schedule with milestone dates, the allowance amount and how it is disbursed, who pays for change orders and delays, and who holds the permits. The more specific the exhibit, the fewer arguments during construction.
- Landlord's work or tenant's work with an allowance: which is better for the tenant?
- Landlord's work shifts cost overrun risk to the landlord but gives the tenant less control over contractor, finish, and timing. Tenant's work with an allowance gives control but puts overruns on the tenant. Small tenants with no construction experience often prefer landlord-built turnkey space; tenants with specific needs, such as medical or restaurants, usually want control.
Related terms
-
Tenant improvement allowance (TI)
Money the landlord contributes toward building out the tenant's space.
-
Delivery condition
The physical state in which a landlord must hand over space to a tenant, spelled out in the lease.
-
Vanilla shell (white box)
A space delivered with basic finishes: walls, ceiling, lighting, HVAC, restrooms, and a concrete floor, ready for a tenant's fit-out.
-
Substantial completion
The point when construction is finished enough for the space to be used for its intended purpose.
Where this term shows up
In a lease: Tenant improvement allowance · Mechanic's liens · Landlord's work and the punch list (Lease Clause Decoder)
In the Insights:
Terms that point here: As-built drawings · Punch list · Force majeure
← All 537 terms · Talk to a licensed advisor about your deal →