Glossary · Commercial real estate
Punch list
The written list of incomplete or defective items a contractor must fix before final payment is released.
What it means
A punch list is the itemized record of work that remains incomplete, incorrect, or defective when a construction project reaches substantial completion. It is prepared during a walk-through by the owner, the architect, and the contractor, and it defines the remaining scope the contractor must finish before final payment and release of retainage. Items are typically minor: hardware, paint, caulking, cover plates, a door that sticks. Anything that prevents the space from being used for its intended purpose belongs in the definition of substantial completion itself, not on the punch list.
Why it matters on the South Shore
Tenant build-outs and landlord work on the South Shore are usually done by small general contractors who juggle several jobs. Once a job is “done” and the big check is paid, the crew moves to Plymouth or Quincy and the punch list sits for months. For ICS tenant clients, the lease and the construction contract should both tie money to the list: rent commencement to substantial completion, final payment to punch list completion, and a dollar-per-day incentive if it drags. A thorough walk-through at delivery is the cheapest leverage a tenant ever has.
In practice
A contractor finishes a $180,000 build-out of 4,000 square feet of Brockton office space. At the walk-through the tenant’s architect records 31 items: 12 paint and drywall touch-ups, 6 missing or loose cover plates, 4 doors out of adjustment, 3 ceiling tiles damaged, 2 light fixtures flickering, a leaking sink trap, and 3 data jacks unlabeled. Retainage held is $18,000, 10 percent of the contract. The contractor completes 29 items within 21 days; the final two take another three weeks, and the $18,000 releases on day 44.
Straight answers
- Who prepares the punch list?
- Usually the owner or tenant with its architect, walking the space with the contractor at substantial completion. Each item is written down with a location and description: missing cover plate in room 104, door that does not latch, paint touch-up on the north wall. The contractor signs off on the list, and the parties agree on a completion date, often 30 days.
- What if the contractor never finishes the punch list?
- That is what retainage is for. A typical construction contract holds back 5 to 10 percent of the contract price until punch list items are complete. If the contractor walks, the owner uses the retainage to hire someone else. Document everything in writing with photos and dates; a verbal promise to come back is not enforceable in any practical sense.
Related terms
-
Substantial completion
The point when construction is finished enough for the space to be used for its intended purpose.
-
Holdback
Money withheld at closing or from a loan until a condition is met, then released or applied.
-
As-built drawings
Construction drawings revised to show what was actually built, not what was designed.
-
Work letter
The lease exhibit that defines who builds what, to what standard, on what schedule, and who pays.
Where this term shows up
In a lease: Landlord's work and the punch list (Lease Clause Decoder)
← All 537 terms · Talk to a licensed advisor about your deal →