Site plan review
The town's review of a project's layout, parking, drainage, lighting, and access.
What it means
Site plan review is a planning board process that examines how a project sits on its lot: circulation, parking, stormwater, lighting, landscaping, and utilities. Unlike a special permit, it generally cannot deny an allowed use, but it can impose conditions that change the cost and timeline.
Why it matters on the South Shore
Stormwater is the South Shore’s recurring site plan issue, because many commercial lots were paved decades ago under older rules and any redevelopment has to meet current standards. A buyer planning to repave or expand a lot should price that engineering before closing.
In practice
A Stoughton owner adding 3,000 square feet to a warehouse goes through site plan review, which requires an infiltration system for the new roof runoff and 14 additional parking spaces. The project proceeds with both.
Straight answers
- When is site plan review required?
- Most Massachusetts towns trigger it for new commercial construction, additions above a size threshold, changes of use that add parking demand, or any project that alters the site's drainage or access. Interior fit-outs usually do not require it.
- What does site plan review cost?
- The town's filing fee is modest; the real cost is the civil engineer, landscape plan, lighting plan, and stormwater calculations the application requires, which can run from several thousand dollars for a simple site to much more for a complex one.
Related terms
Where this term shows up
In a lease: Parking and common areas · Permits and approvals contingency (Lease Clause Decoder)
In the Insights:
- Getting a special permit on the South Shore: the hearing process from application to decision
- Flex and small industrial space on the South Shore: what a 5,000-square-foot owner-user should know
- The MBTA Communities Act for commercial owners: what Section 3A changes about the land under your building
- The Route 18 corridor from Weymouth to Bridgewater: what trades, what sits, and where the next owner-user buys
Terms that point here: Curb cut · Parking ratio · Variance · Certificate of occupancy · Conservation Commission · Drive-thru stacking · Entitlements · Open Meeting Law
← All 537 terms · Talk to a licensed advisor about your deal →