Order of Conditions
The Conservation Commission's written permit for work near wetlands, with the rules the project must follow.
What it means
An Order of Conditions is the decision a Conservation Commission issues after a public hearing on a Notice of Intent under the Wetlands Protection Act. It approves, approves with conditions, or denies the proposed work. Approvals come with standard conditions set by MassDEP plus special conditions written for the site, such as erosion controls, limits on work seasons, stormwater maintenance, and replication of any wetland filled. The Order is recorded at the registry of deeds and runs with the land until a Certificate of Compliance is issued.
Why it matters on the South Shore
With so many South Shore commercial sites touching a buffer zone or riverfront area, Orders of Conditions are routine, and the conditions themselves shape the budget and schedule. A requirement for a two-to-one wetland replication area or a stormwater system maintained forever is a cost most buyers do not model. An open Order from a prior owner is one of the most common title surprises we see in Hanover, Marshfield, and Plymouth, usually because someone built a parking lot in 2009 and never closed it out.
In practice
A Marshfield owner expands a parking lot by 30 spaces inside the 100-foot buffer. The Order of Conditions requires silt fence and haybales during construction, a deep-sump catch basin with annual cleaning, and a 2,000 square foot planted buffer restoration. Construction cost rises about $35,000 and the owner must file for a Certificate of Compliance when done. The lot is built in one season, and the recorded Certificate clears the title for a sale four years later.
Straight answers
- How long is an Order of Conditions valid?
- Three years from the date of issuance, with extensions available on request. The work must be completed within that time or an extension obtained. When the work is done, the owner applies for a Certificate of Compliance, which closes out the Order and is recorded at the registry of deeds.
- What happens if a prior owner never got a Certificate of Compliance?
- The Order stays open on the title, and the conditions still bind the land. Lenders and buyers often insist on a Certificate before closing. Getting one for old work means an as-built plan and a commission inspection, and if the work strayed from the approved plan, the fix can be expensive. Check for open Orders in due diligence.
Related terms
-
Conservation Commission
The town board that administers the Wetlands Protection Act and any local wetlands bylaw.
-
Wetlands Protection Act
Massachusetts law, Chapter 131 Section 40, regulating work in and near wetlands, banks, floodplains, and rivers.
-
Site plan review
The town's review of a project's layout, parking, drainage, lighting, and access.
-
Due diligence period
The contractual window to inspect, investigate, and walk away with your deposit.