Construction loan
A short-term loan that funds a building project in draws as work is completed, repaid by permanent financing or sale.
What it means
A construction loan funds the hard and soft costs of building or substantially renovating a property. Unlike a permanent mortgage, it is advanced in draws as work progresses, carries a floating rate with interest-only payments, and matures in one to two years. The lender sizes it as a percentage of total project cost, typically 65 to 80 percent, and requires the borrower’s equity to go in first. Repayment comes from a permanent loan once the building is complete and leased, or from a sale.
Why it matters on the South Shore
Local and regional banks headquartered on the South Shore do most of the construction lending for projects under $15 million: owner-user buildings in Rockland and Hanover, small flex buildings in Plymouth, and Brockton redevelopment. They want to see entitlements in hand, a fixed-price contract or a guaranteed maximum price, and a contingency. For owner-users, an SBA 504 loan can fund construction and then convert to permanent debt, which removes the takeout risk that worries most lenders.
In practice
A contractor builds a 12,000 square foot flex building in Plymouth. Total cost is $3.6 million: $2.9 million hard, $400,000 soft, $300,000 land already owned. The bank lends 70 percent of cost, $2.52 million, at prime plus 1 with interest-only payments; the owner’s land and $780,000 in cash go in first. Draws run monthly over ten months, and at substantial completion the loan converts to a 25-year SBA 504 structure with the bank in first position.
Straight answers
- How are construction loan draws paid out?
- In stages. The borrower submits a requisition with invoices and a schedule of values, the lender's inspector confirms the work is in place, and the bank funds that portion, often holding back 5 to 10 percent retainage until completion. Interest accrues only on what has been drawn, so the first months are cheap and the last months are not.
- What happens when the construction loan matures?
- It is paid off by a permanent loan, a sale, or an extension. Most construction loans run 12 to 24 months with one or two extension options for a fee. If the building is not leased enough to qualify for permanent debt at maturity, you need a bridge loan or fresh equity, so line up the takeout before the first draw, not the last.
Related terms
-
Loan-to-cost (LTC)
The loan amount divided by the total cost of a project, including land, construction, and soft costs.
-
Bridge loan
Short-term, higher-rate financing that carries a property until a sale, lease-up, or permanent loan.
-
Hard costs vs. soft costs
Hard costs are physical construction; soft costs are the design, permits, fees, and financing around it.
-
Substantial completion
The point when construction is finished enough for the space to be used for its intended purpose.