Glossary · Commercial real estate
Hard costs vs. soft costs
Hard costs are physical construction; soft costs are the design, permits, fees, and financing around it.
What it means
Hard costs are the costs of physically building something: labor, materials, site work, structure, mechanical and electrical systems, and finishes. Soft costs are everything else the project requires that is not a physical part of the building: architectural and engineering fees, permits and impact fees, legal and title work, surveys, environmental reports, construction loan interest, insurance, marketing, and the developer’s or project manager’s fee. Lenders, appraisers, and tax advisors treat the two categories differently, which is why budgets separate them.
Why it matters on the South Shore
South Shore owner-users building out a flex unit in Rockland or converting a Brockton storefront to a clinic tend to budget hard costs carefully and forget the soft costs until the invoices arrive. Permit and site plan review fees vary by town, and an engineer’s stamp is often required for anything touching structure, sprinklers, or septic under Title V. Soft costs also determine how much of a project an SBA 504 or 7(a) loan will finance, so the breakdown goes into the loan package, not just the contractor’s bid.
In practice
A contractor buys a 9,000 square foot flex building in Hanover for $1.35 million and plans an office and showroom conversion of 3,000 square feet. Hard costs bid at $115 per square foot, $345,000. Soft costs include $31,000 in architectural and engineering fees, $6,500 in permit fees, $9,000 in legal and survey, $12,000 in construction-period interest, and $8,000 in contingency and project management, totaling $66,500, about 19 percent of hard costs. The all-in budget of $411,500 goes to the lender, and the breakdown later feeds a cost segregation study. Talk to your CPA about how each category is depreciated.
Straight answers
- What percentage of a construction budget is soft costs?
- For a commercial build-out, soft costs typically run 15 to 30 percent of hard costs. Architecture and engineering alone are usually 6 to 12 percent, and permits, legal, project management, and construction-period interest fill out the rest. Ground-up projects with site work and entitlement risk land at the higher end.
- Does a tenant improvement allowance cover soft costs?
- Only if the lease says so. Many landlords limit the allowance to hard costs and permit fees, excluding design fees, furniture, cabling, and moving. Tenants should negotiate for the allowance to cover soft costs too, or at least architectural fees, since those are paid before a single wall goes up.
Related terms
-
Build-out
The construction work that turns a shell or a prior tenant's space into space ready for a new tenant.
-
Tenant improvement allowance (TI)
Money the landlord contributes toward building out the tenant's space.
-
Pro forma
A projected operating statement showing what a property should earn going forward.
-
Cost segregation
A tax study that reclassifies parts of a building into shorter depreciation lives, accelerating deductions.
Where this term shows up
In a lease: Tenant improvement allowance (Lease Clause Decoder)
Terms that point here: Construction loan · Contingency reserve
← All 537 terms · Talk to a licensed advisor about your deal →